Challenge

Top Lift needed offices that could withstand the elements and be included at the base of their fabric building setup.

Solution

Rockbox outfitted a pair of twin 20' offices with an easy to clean epoxy floor and durable steel corrugated wall finish, shipped right to location for placement.

Results

Top Lift was able to seamlessly integrate their 20' offices into their project.


project preview

Gallery

No items found.